Flooding or water ingress into warehouse and plant areas causing stock damage and operational disruption
25
Inherent
Critical
I5 × L5
15
Residual (current)
High
I5 × L3
10
Target (appetite)
Medium
I5 × L2 · by 31 Mar 2027
Residual score by quarter
Q1
Q2
Q3
Q4
Heavy rain overwhelms drainage at CST; water reaches finished goods and raw material stores.
Root causes
- Heavy rainfall during El Niño season
- Inadequate external drainage capacity
- Roof and gutter failure; building leaks
- Blocked storm-water channels
Consequences
- Damaged finished goods and raw material stock
- Production and dispatch interruption
- Food-safety exposure from wet stock
Owning unit
Unga Limited › CST › Finished Goods
Also affects
RMPM
Linked group risk
GRP-03 Climate & weather disruption